|
Detail produk:
|
| Nama: | Hot DIP Galvanized Steel Flat Bar | Bahan: | Pesawat A36 S235JR |
|---|---|---|---|
| Panjang: | 1-12m atau sesuai kebutuhan | Permukaan: | Hitam / galvanis |
| Nilai: | Q235 | Aplikasi: | Konstruksi, Industri, industri pembuatan kapal |
| Standar: | ASTM,DIN,AISI | Membentuk: | Piring Falt |
| Jenis: | Datar | Panjang: | 5,8-12m |
| Istilah harga: | Cif cfr fob mantan kerja | ||
| Menyoroti: | s235jr iron flat bar,a36 iron flat bar,a36 hot dipped galvanized flat bar |
||
Detail Produk
| Komoditas | Besi datar/besi plat/flat bar |
| Ketebalan dinding | 10- 500mm |
| Lebar | 1 - 300mm |
| Ketebalan | 1.5 mm -42 mm |
| Panjang | 1 - 12m |
| Metode Pemrosesan | Ditarik Dingin, Digulung Panas |
| Material baja | Q195 Q235 Q345 S235JR S355JR |
| Pengemasan | Paket Standar Layak Laut |
|
Perawatan Permukaan
|
Galvanis dan Hitam |
| Aplikasi | Diterapkan pada bangunan dan struktur baja 1. Berbagai struktur bangunan dan struktur teknik. 2. Balok, jembatan, kapal; 3. Menara transmisi, menara reaksi; 4. Mesin pengangkat transportasi; 5. Rangka kontainer, rak barang gudang, dll |
| Jangka Waktu Pembayaran | Uang Muka 30% + Saldo 70% Dibayar Sebelum Pengiriman |
| MILD STEEL CARBON FLAT BAR | |||
|
Lebar (mm) |
Ketebalan (mm) |
Panjang (m) |
Berat Teoritis (kg/m) |
| 20 | 2.0 | 6/9/12 | 0.31 |
| 20 | 2.5 | 6/9/12 | 0.39 |
| 20 | 2.75 | 6/9/12 | 0.43 |
| 25 | 2.5 | 6/9/12 | 0.49 |
| 25 | 3.75 | 6/9/12 | 0.74 |
| 30 | 2.5 | 6/9/12 | 0.59 |
| 30 | 3.5 | 6/9/12 | 0.82 |
| 30 | 9.75 | 6/9/12 | 2.30 |
| 40 | 3.5 | 6/9/12 | 1.10 |
| 40 | 4.75 | 6/9/12 | 1.50 |
| 40 | 11.75 | 6/9/12 | 3.69 |
| 50 | 2.75 | 6/9/12 | 1.08 |
| 50 | 4.5 | 6/9/12 | 1.77 |
| 50 | 9.75 | 6/9/12 | 3.83 |
| 60 | 5.5 | 6/9/12 | 2.60 |
| 60 | 7.5 | 6/9/12 | 3.53 |
| 60 | 11.5 | 6/9/12 | 5.42 |
| 80 | 5.5 | 6/9/12 | 3.45 |
| 80 | 7.5 | 6/9/12 | 4.71 |
| 80 | 11.75 | 6/9/12 | 7.38 |
| 100 | 3.25 | 6/9/12 | 2.55 |
| 100 | 4.75 | 6/9/12 | 3.73 |
| 100 | 7.5 | 6/9/12 | 5.89 |
| 120 | 9.75 | 6/9/12 | 9.18 |
| 120 | 11.75 | 6/9/12 | 11.07 |
| 150 | 9.75 | 6/9/12 | 11.48 |
| 150 | 11.5 | 6/9/12 | 13.54 |
| 150 | 13.5 | 6/9/12 | 15.90 |
| 160 | 11.75 | 6/9/12 | 14.76 |
| 200 | 9.5 | 6/9/12 | 14.92 |
| 250 | 5.75 | 6/9/12 | 11.28 |
| 340 | 7.75 | 6/9/12 | 20.68 |
![]()
![]()
![]()
![]()
FAQ:
Q1. Berapa lama pengiriman dapat dilakukan?
A: Untuk produk stok, akan melakukan pengiriman dalam 2-5 hari setelah menerima deposit atau menerima T/T;
untuk produk yang membutuhkan produksi baru untuk bahan umum, biasanya melakukan pengiriman dalam 7-10 hari;
untuk produk yang membutuhkan bahan khusus dan langka, biasanya membutuhkan waktu 15-20 hari untuk melakukan pengiriman.
Kontak Person: Mr. Gao Ben
Tel: +86-18068357371
Faks: 86-0510-88680060